Sunday, October 23, 2005

Ground evaluation at Sipoo


Ground evaluation team
Originally uploaded by Inaki.
We sent a team some weeks ago to check the nature of the ground of our lot. The result is that there is about 2.5m of dirt before you reach the rock and a bit of humidity so we need to build on top of poles.

Mandamos a un equipo para que evaluara el terreno donde queremos construir. El resultado es que hay 2.5m de tierra hasta tocar la roca, con algo de humedad. Asi que tendremos que construir encima de pilares

No comments:

LinkWithin

Blog Widget by LinkWithin